This administrative building for an electronics company was designed and constructed within the space of seven months. As part of this accelerated process, details were tested on a 1:1 prototype model of the corner of the building. The choice of materials projects the image of a technologically innovative company. The steel structure is clad with grooved aluminium sheeting, and the windows incorporate aluminium millwork and frames. Internally, the floors are covered with rubber and composite stone, while the walls and ceilings are plasterboard.
Source: Aga Khan Trust for Culture
Ground floor area: 570 m²; combined floor area: 570 m²; total site area: 15,000 m²