The airport opened in 1961. The current main terminal was designed by the firm Dar Al Handasah to resemble the mud brick architecture of Mali. The runway is 2,110m (6,922ft) in length, but it not lit for night activity.
The airport opened in 1961. The current main terminal was designed by the firm Dar Al Handasah to resemble the mud brick architecture of Mali. The runway is 2,110m (6,922ft) in length, but it not lit for night activity.